Skip to content
NorthlineProperty & Build
Modern bathroom with wall-hung basin, mirror and brushed metal fixtures

04 — Sanitary

Sanitary Installation & Bathroom Solutions

Fixtures set out, installed and sealed so a bathroom works as well as it looks.

A bathroom is judged on details: whether the basin sits level, whether the shower drains properly, whether the silicone line is straight. Sanitary installation is where the plumbing behind the wall becomes something you use every day.

We set fixtures out against the tile layout rather than the other way round, so waste positions land where they should, falls actually run, and cut tiles do not end up in the eyeline. Where a bathroom is being replaced rather than built, we strip back, check what is behind, and correct it before anything new goes in.

Everything is installed to the manufacturer's specification, sealed properly, and tested under working conditions before it is signed off.

  • Set out to the tile layout

    Fixture positions are planned with the tiling so cuts and joints land where they should.

  • Sealed to last

    Correct substrate, correct sealant, correct falls — the three things that decide whether a wet room stays dry.

  • Access kept

    Concealed cisterns and valves stay reachable for the repair that eventually comes.

What's Included

Sanitary — what we cover.

Any of these can be booked on its own, or combined into one sequenced project.

  • 01

    Toilets & Concealed Cisterns

    Floor-standing and wall-hung units, with frames set out and access retained.

  • 02

    Wash Basins & Vanities

    Pedestal, wall-hung and vanity-mounted basins levelled and sealed.

  • 03

    Showers & Enclosures

    Trays, level thresholds, screens and enclosures set to a working fall.

  • 04

    Baths

    Installation, support, panelling and sealing.

  • 05

    Taps & Mixers

    Fixture installation, sealing and commissioning under working pressure.

  • 06

    Bathroom Accessories

    Rails, holders, shelves and mirrors fixed into sound backing, not into tile alone.

  • 07

    Fixture Replacement

    Swapping failing units without retiling the whole room wherever that can be avoided.

Gallery

Wall-hung basin and mixer tap installed against large-format tiling
Basins and taps
Walk-in shower enclosure with a level threshold and linear drain
Showers and enclosures
Wall-hung toilet with a concealed cistern and access panel
Concealed cisterns

Our Process

How sanitary work runs.

The stages specific to this discipline — each one signed off before the next begins.

  1. 01

    Layout Review

    Fixture positions checked against the room, the tile setting-out and the existing waste runs.

  2. 02

    Strip Out

    Existing fixtures removed and what is behind them inspected before anything new goes in.

  3. 03

    Preparation

    Substrate, falls, tanking and pipework corrected where needed.

  4. 04

    Installation

    Fixtures set, levelled and connected to manufacturer specification.

  5. 05

    Sealing & Finishing

    Silicone lines, trims and access panels finished cleanly.

  6. 06

    Testing

    Everything run under working pressure and checked for leaks and drainage.

FAQ

Sanitary — your questions.

Something not covered here? Ask us directly and we'll come back with a straight answer.

Can you replace fixtures without retiling the whole bathroom?

Usually yes, provided the new unit covers the same footprint. We check before quoting and tell you honestly if retiling is unavoidable.

Do you install wall-hung toilets and concealed cisterns?

Yes. We set the supporting frame out properly and keep a serviceable access point, which is the part most often got wrong.

Do you do the tiling as well?

Yes — our tiling team works to the same setting-out, so fixtures and tile joints are planned together rather than separately.

Can you supply the fixtures, or do I buy them?

Either. We can work to fixtures you have chosen, or specify options against your budget and the room's constraints.

Related Services

These are the disciplines most often sequenced with it — booked together, they are planned as one job rather than handed between contractors.

Get Started

Planning sanitary work?

Tell us what you have in mind. We'll arrange a site visit, assess the work, and come back with a written scope and quotation before anything begins.

hello@example.com · +92 XXX XXXXXXX