Case Study

The Courtyard Villa

A dated villa stripped back and rebuilt around its central courtyard, with all three bathrooms replaced.

Villa courtyard framed by arched openings and new stone paving
Location
Islamabad
Project type
Full renovation
Status
Sample project
Services involved

Project Overview

A renovation that removed forty years of additions to get back to a plan that already worked, then rebuilt the services from scratch.

The challenge
Successive extensions had closed the courtyard off from the rooms around it, leaving the centre of the house dark and the circulation confused. The plumbing had been extended piecemeal over decades, with no isolation and no record of what ran where.
Our approach
The later additions came down and the courtyard openings were taken back to full height. Rather than patch the plumbing, the whole supply and waste layout was replaced with a documented system with accessible isolation points. All three bathrooms were stripped to the substrate before anything new was specified.
The result
The courtyard is again the middle of the house rather than a light well behind it, and the services are documented for whoever works on them next.

Scope of work

01

Construction

Later additions were removed and the structural openings onto the courtyard enlarged and supported. Original walls were retained and repaired where they were sound.

02

Plumbing & Sanitary

The supply and waste layout was replaced entirely, with isolation valves grouped and labelled. All three bathrooms were stripped back, substrates corrected and tanked, then fitted with wall-hung fixtures on properly set-out frames with retained access.

03

Interior Work

Tiling was set out so joints align between floor and wall in each bathroom, with cuts pushed out of the eyeline. Internal doors and frames were made to match profiles taken from the surviving original joinery.

04

Final Result

Rooms on all four sides now open onto the courtyard, and the house reads as one plan again rather than a sequence of additions.

Gallery

Courtyard elevation during renovation with openings enlarged
01Opening up the courtyard elevation
Renovated bathroom with wall-hung fixtures and floor-to-ceiling tiling
02Principal bathroom
New timber doors and frames fitted into original openings
03Replacement joinery

Sample case study. The narrative, location and dates above illustrate the format and are not a record of completed work — replace them in src/data/projects.js.

Next Step

Have a Similar Project?

Tell us what you're planning. We'll arrange a site visit, assess what the work involves, and come back with a written scope and quotation.

hello@example.com · +92 XXX XXXXXXX